Zone 4, Brgy. San Jose, San Miguel, Iloilo 5025
Mon–Fri 8AM–5PM · Sat 9AM–5PM · +63 918 915 6400
Crew working the CNP2 Talamban 230kV cable project in Cebu
Plant operations team at the CAPELCO diesel power plant
Electrical and instrumentation testing works
Building & Constructing Since 2012 · Philippine Grid

We Keep
The Lights
On.

Garcap Power Solutions, Inc. is a Philippine-based electrical engineering company building, operating, and maintaining the infrastructure the Visayas runs on — power plants, transmission lines, and substations. No shortcuts. No downtime. Delivered to spec.

Live Project · 230KV

Cebu–Negros–Panay Submarine Cable

Talavera, Toledo City, Cebu

Company Video · 2 Minute Overview

See Garcap At Work

A closer look at the people, projects, and standards behind every Garcap build.

What We Do · Organized by Objective

Pick Your Objective.
We Bring The Power.

Every engagement starts with what you need the grid to do — build new capacity, keep existing assets running, or prove your systems are safe and compliant.

Build

New Capacity

Design and construction for generation and delivery infrastructure, from consultancy through energization.

  • Transmission Line Construction69–230kV
  • Substation ConstructionEPC
  • Engineering & ConsultancyPre-Con
  • Construction ManagementFull Cycle
Operate

Keep It Running

Long-term operation and maintenance that keeps plants online safely, economically, and under warranty.

  • Power Plant O&MUp to 20-yr
  • Plant Upgrade WorksIn-Service
  • Industrial Equipment ServicingScheduled
  • Performance WarrantiesExtensive
Assure

Prove It's Safe

Testing and inspection that keeps electrical systems reliable and businesses compliant.

  • Electrical Equipment TestingCompliance
  • Safety InspectionSite-Wide
  • Instrumentation WorksIndustrial
  • System CommissioningSign-Off
Our Core Values · What Drives Every Build

Power Built On Principle.

Safety, precision, and integrity aren't slogans here — they're the standard every Garcap crew is held to, from first pour to final energization.

Transmission line crew on tower worksSAFE

Safety First

No Exceptions

Every crew stops work before cutting a corner. High voltage doesn't forgive improvisation, and neither do we.

Zero Lost-Time IncidentsOSH CertifiedLive-Line Trained
Plant operations team at the CAPELCO diesel power plantPREC

Precision Under Pressure

Engineered, Not Guessed

Every connection calculated, tested, and signed off by licensed professional engineers before it goes live.

PEE-SupervisedCalibrated InstrumentsPEC Compliant
Substation construction worksINTEG

Integrity In Every Connection

Delivered To Spec

No shortcuts, no substitutions, no surprises. What's contracted is what gets built, buy-side and sell-side.

PCAB CompliantSEC & DTI RegisteredNGCP Accredited
Electrical and instrumentation testing worksDURA

Built To Outlast

20-Year Contracts, Daily

Infrastructure built for decades of service, backed by round-the-clock operation and maintenance.

24/7 RosteredRME LicensedMulti-Decade O&M
Proven Work · Real Projects, Real Load

Transformations We've Delivered

Not renders. Not promises. Infrastructure that's carrying load right now across Cebu, Capiz, and Negros Occidental.

CNP2 Talamban 230kV cable project
Talamban, Cebu

CNP2 Talamban 230kV Cable

Part of the Cebu–Negros–Panay backbone: 230kV cable works connecting three island grids so power flows where demand is — keeping the Visayas connected and ahead.

230kVVoltage class
3Islands linked
CNP2Grid backbone
Enervantage CAPELCO diesel power plant
CAPELCO Compound, Panit-an, Capiz

Enervantage Diesel Power Plant

O&M contractor for the 2 × 5.5MW CAPELCO diesel power plant — a 20-year contract covering operation, maintenance, upkeep, and upgrade works. The long game, played daily.

11MW2 × 5.5MW units
20 YRSO&M contract
24/7Operations
Asian Alcohol Corporation electrical and instrumentation works
Brgy. Canjusa, Pulupandan, Negros Occidental

Asian Alcohol Corp · Praj Far East

Installation of electrical and instrumentation works for a major industrial distillery client — precision E&I delivered inside a live production environment.

E&IFull installation
LIVEOperating site
SPECDelivered to
Trusted By · The Companies That Power The Philippines
NGCP
Prysmian Group
Enervantage
Praj Industries
Cebu Pacific
Schema Konsult
More Power
NGCP
Prysmian Group
Enervantage
Praj Industries
Cebu Pacific
Schema Konsult
More Power
From The Blog · News & Field Notes

Latest From Garcap

Project updates, safety notes, and industry insight from the crews keeping the Visayas grid running.

View All Posts →
Start A Project · Response Within 1 Business Day

Ready To Energize
Your Future?

Tell us what you're building, operating, or testing. A Garcap engineer — not a call center — reviews every inquiry and comes back with next steps.

Call +63 918 915 6400